Jiangpin Restaurant Furniture Sourcing Desk foshanrestaurant.com →

Guides / Factory audit

Auditing a factory that makes table and chair sets: the five things that decide the outcome

In short: Skip the showroom and walk the drying kiln, the joinery line, the finishing booth and the packing area. Those four places, in that order, tell you more about table and chair sets than any certificate on the wall.

Lead time
45–70 days door to door
Sampling
15 days, no sampling fee
MOQ
1 set
Load rating
150 kg whole-chair static
Custom sizes
No upcharge, no tooling fee

Start at the kiln, not the showroom

Moisture content is the single largest cause of cracked and loose table and chair sets in service. Ask to see the kiln log and a pin meter reading taken in front of you on a stack that is waiting to be cut. A reading between 8% and 10% is normal for export timber; a reading above 12% means the furniture will move after it lands.

A factory that buys pre-dried timber and does not own a kiln is not automatically a bad factory, but it cannot control the one variable that matters most. If there is no kiln, ask for the supplier's moisture certificate and a retained sample.

Watch one joint being cut

Ask to see a mortise and tenon, a dowel joint or a weld being made — whichever the model uses. What you are watching for is whether the operator measures or eyeballs, and whether the fixture exists at all. A proper jig means the tenth chair is identical to the first. No jig means it is not.

This is where the price difference between two quotations for identical table and chair sets usually lives. One factory has a fixture and a jig; the other has a skilled man and a good day.

Check the finishing line and the packing bay

A finishing booth with filtered air and a controlled flash-off time gives a finish that survives cleaning chemicals. An open bay with a fan gives a finish that looks the same on day one and dulls within a year. Ask what the finish is, in chemical terms, and how many coats, and write it on the order.

Then walk to packing. Corner protection on every carton, a moisture barrier, and a carton marked with the model and the quantity is the difference between a clean delivery and a claim. If the packing area is where the factory keeps its overflow, that is what will happen to your order.

Why the specification, not the price, is the decision

Two quotations for table and chair sets are only comparable when they answer the same written specification. Once they do, the remaining difference is construction and material grade — which is exactly the difference that shows up in year two, in a room full of guests, with no spare chairs.

The cheapest reliable path is to fix the specification, fix the drawing, and then compare. It takes one extra week at the start and removes most of the reasons a project has to buy the same furniture twice.

Sampling, and what the sample is for

A physical sample takes about 15 days and carries no sampling fee; the courier is on the buyer's account. The sample is not a formality — it is the only point at which the seat height, the finish and the fabric can be checked together before a production run exists.

Keep the approved sample, or a signed photograph of it with the finish and fabric references written on the back. When the production run arrives, that sample is the specification. Without it, the comparison becomes a memory.

What happens after delivery

Two things cause most after-delivery problems: settlement in the first weeks, and a finish that does not survive the cleaning chemical the venue actually uses. Both are preventable. Let the furniture settle in its final room for a few days before final positioning, and ask for the cleaning instruction in writing with the cleaning agent named.

Replacements and spare parts ship with the next order rather than as a single parcel, which keeps the cost of a small claim proportionate. Tell the factory what failed and send a photograph; a joint that opened in service is information the next run can use.

Where this fits on our own range

Our table and chair sets, four-cover dining sets and velvet restaurant table and chair sets are built to the same drawing discipline, so the numbers above apply there without translation. These are the pages the same workshop builds to, so the dimensions, finishes and load ratings discussed above apply directly rather than in principle.

Two models built to the specification discussed above are the JP-S069 table and chair set and the JP-S035 table and chair set; both are quoted against your drawing rather than a stock size.

Frequently asked questions

What is the lead time for table and chair sets?

Sampling takes about 15 days and production 15–30 days after the approved sample, so plan on 45–70 days from drawing approval to a container at your door, including transit and customs.

What load rating should I ask for?

Ask for a whole-chair static load rating that applies the load to the seat and back assembly together, not a seat-only figure. The target for restaurant use is 150 kg.

Can the dimensions be changed?

Yes. Every model can be re-dimensioned, and the price basis does not change. The requirement is that the final dimensions are confirmed on the drawing before production, because a custom size is a new structure.

Sources and further reading

Other guides in this series